Port Mann Tunnel Project

Surrey, B.C.

2015 Dean’s entered into a $1.4 million dollar contract with Mcnally/Aecon JV for welding of the Port Mann Tunnel Project in Surrey, B.C for Metro Vancouver. We welded a little over 2k feet of 84”x1” steel pipe that was all butt welded with a backing bar. We also welded the (2) 240 foot shafts. The tunnel ran 50 feet below the Port Mann River bed.

ClientMcnally & Aecon JVYear2015Share