Upper Lillooet Hydro Electric project for Innergex
2015 Dean’s entered into a $2 million dollar contract with CRT-EBC for the Upper Lillooet Hydro Electric project for Innergex. The over 2k feet of 144” penstock was located 40 miles outside of Pemberton, B.C. The pipe ranged in thicknesses of ½”-3/4” and included a 500ft run of pipe on a 40% grade.
ClientCRT-EBCYear2015Share

